Construction progress

«LIFE STORY» construction progress:

1q 20204q 2021

We share news from the LIFE STORY construction site as of November 23, 2020:

  • 2400 m3 of soil was dug from the pit.

We share news from the LIFE STORY construction site as of November 16, 2020:

  • The excavation of the pit has begun.

Video

Photos

Video

Photos

Sales
office

Kyiv

72 V. Vasylkivska Street
Olimpiiskyi BC, the 26th floor

13-А, Metrolohichna str
near the construction site

 

+38 044 499 88 40

Lviv

11, Hrushevsky str.
 

30, Maloholoskivska str
 

Pasichna str, opposite №127

+38 096 394 00 44

Receive construction progress reports

Thank you!

You are subscribed to news
about «LIFE STORY»

Choose an apartment Phone callback